From charlesreid1

Revision as of 19:01, 15 January 2018 by Admin (talk | contribs) (→‎bots)

Task list for January:

planning stages

notes

2018/January/Notes Repositories

data engineering

Data engineering scenarios

  • Basic workflow, dealing with large amounts of data and doing machine learning on it
  • See also: Google Cloud/Review

Network data

  • Overarching goal
  • Gather data
  • Analyze trends
  • Create data sets
  • Data engineering: gathering data process, analysis process, modeling process

Charlesreid1.com data

  • Logs
  • Network traffic
  • Loading
  • Pages
  • Processes

2018/January/Data Engineering

kali

Network testbed:

  • Analyzing network traffic
  • Creating data capture workflow
  • MITM

openvpn

  • cmr
  • router

General thread of things:

  • MITM
  • Windows exploits
  • Payload generation
  • Remote shells
  • C&C
  • Metasploitable, etc.

Git repos:

  • Setting up network testbed and instrumentation (W?)
  • Scripts for executing different attacks, etc.
  • Dropbear scripts - new org? kali?

raspberry pi

FlightAware

Microphone? Camera?

Wireless weatherproof IP camera?


in progress

mon jan 15

bots

master git repos

blog posts

  • Blog posts:
    • Knuth permutation generation
    • 4x4 Rubik's Cube: Part 1: Representations
    • 4x4 Rubik's Cube: Part 2: Permutations
    • 4x4 Rubik's Cube: Part 3: Cycles
    • Bots: Part 1: Rainbow Mind Machine, Sheep Shepherd Keymaker
    • Bots: Part 2: Poem Bot Flock
    • Bots: Part 3: Queneau Bot Flock
    • Bots: Part 4: Custom Bot Behaviors
    • Google Data Engineering Certification blog post and notes highlights
    • Data engineering scenario rollouts

genealogy

Genealogy photos:

  • Photos cropped and organized by family
  • Send email to fam with link on Dropbox (or something)

Writing:

  • Pauline and Bruce chapters
  • Historical research planning

complete

project euler

  • Project Euler:
    • Project Euler: Problem 172
    • Clean up problems 52-67

Project Euler/172

rubiks cube

2018/January/Rubiks Cube

desk reorg

Reorganize and rearrange desk

  • Move book boxes to room, move table from room to main area
  • Consolidate plastic tubs
  • Computer lab - 2 laptops + desktop
  • Switch to dropbear as the main router

master git repos

Create master repo for each organization - each repo in org as a submodule


Flags